first of November
It’s been a bit hectic since the last update. Basically because of all the shockingly bad diy and other alterations made in and to the house we have decided we are very very carefully stripping EVERYTHING back on the walls (and ceiling) to the original chipboard lining (and ceiling T&G) and most likely we will change the interior back to it’s original layout so we get a smaller shower room and gain a separate additional WC.
So we have been busy filling a skip with ceramic tiles and brick slips and the car port with mdf, ply, chipboard and acres of T&G.
I’ll hopefully add some more pics that D has taken as mine only scratch the surface of what we have done…
